Fractures with highly different pore pressure causing
– Downhole Blowouts
– Downhole Kicks
Solution: Run Liner while Drilling
– Kick / Loss Control
– Hole Protected
– Liner at Desired Position
Open Requirements:
– Immediate Cementing Option
(Cement through motor or new method to be designed)
Find Blog
Selasa, 02 Juni 2009
Drilling Liner (Application 5)
Diposting oleh migasnet01_muhammad718 di 22.04 0 komentar
Label: Minyak dan Gas
Drilling Liner (Application 4)
Deep Water Shallow Water Flow
– Washed out top hole Section
– Casing Erosion
Solution: Run Liner while Drilling
– Hole Protected
– Liner at Desired Position
Open Requirements:
– Immediate Cementing Option
(Cement through motor or new method to be designed)
– >= 20” DL Tool Sizes
– Liner Hangers (current .max.=16”)
Diposting oleh migasnet01_muhammad718 di 21.47 0 komentar
Label: Minyak dan Gas
Drilling Liner (Application 3)
Unconsolidated formations
– Unconsolidated Sands
– Horizontal Wellpath
Solution: Run Liner while Drilling
– Hole Protected
– Liner at Desired Position
Open Requirements:
– Directional Drilling Capability
(to be designed)
Diposting oleh migasnet01_muhammad718 di 21.45 0 komentar
Label: Minyak dan Gas
Drilling Liner (Application 2)
Unstable Formations with time dependent bore hole stability
– Shale
– Salt
Solution: Run Liner while Drilling
– Hole Protected
– Liner at Desired Position
Diposting oleh migasnet01_muhammad718 di 21.43 0 komentar
Label: Minyak dan Gas
Drilling Liner (Application 1)
Adjacent formations with highly different pore pressure due to
– Faults
– Sub Pressured Reservoir
– Depleted Reservoir
Solution: Run Liner while Drilling
– Kick / Loss Control
– Hole Protected
– Liner at Desired Position
Diposting oleh migasnet01_muhammad718 di 21.35 0 komentar