Fractures with highly different pore pressure causing
– Downhole Blowouts
– Downhole Kicks
Solution: Run Liner while Drilling
– Kick / Loss Control
– Hole Protected
– Liner at Desired Position
Open Requirements:
– Immediate Cementing Option
(Cement through motor or new method to be designed)
Find Blog
Selasa, 02 Juni 2009
Drilling Liner (Application 5)
Diposting oleh migasnet01_muhammad718 di 22.04
Label: Minyak dan Gas
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar