THOUSANDS OF FREE BLOGGER TEMPLATES

Find Blog

Kamis, 28 Mei 2009

Multi Disciplinary Drill Center Design Team

World Class Subsea Hardware

1. 5” bore; 15ksi vertical guidelineless trees with electro- hydraulic control systems & fibre-optic capability for downhole monitoring
2. Manifolds linked to facility via looped, piggable, high pressure flowlines with external insulation
3. Insulated Steel Catenary Risers with Flexible Top Connections
4. 73 miles of Flowlines & Risers
5. 63 miles of Umbilicals

BOP Picture

Field Development Plan

1. Up to 25 wells in 4 drill centers plus satellites
2. Semisubmersible production platform with production, water injection, and full drilling capability at main drill center
3. Mobile Drilling Unit Support as required at remote well centers