THOUSANDS OF FREE BLOGGER TEMPLATES

Find Blog

Jumat, 29 Mei 2009

Completion Schematic and Sand Production Potential

SPAR Sub Sea Equipment and Sea Floor Layout

Pressure Prediction and Casing Design

Transocean Enterprise-Pre-Drill and Complete

6 5/8” Completion for Thunder Horse

WH Drilling dan Completions Conference Thunder Horse Drilling Performance

Thunder Horse Well Challenges

• Water depth-5600’in North-6300’in South
• 18,000 psi BHP>15ksi equipment
• 35-50,000 BOPD Oil Wells
• Casing Design-H2S, CO2, APB, Rate/ Size/Pressure, SCSSV
• PP/FG>ECD Management
• 5000’ Salt-Geologic Uncertainty>Well Planning
• Completion Serial No. 1’s-Packer, SCSSV, CIM, Gas Cap, SC
• 25,000’TVD>3 different reservoirs