• Water depth-5600’in North-6300’in South
• 18,000 psi BHP>15ksi equipment
• 35-50,000 BOPD Oil Wells
• Casing Design-H2S, CO2, APB, Rate/ Size/Pressure, SCSSV
• PP/FG>ECD Management
• 5000’ Salt-Geologic Uncertainty>Well Planning
• Completion Serial No. 1’s-Packer, SCSSV, CIM, Gas Cap, SC
• 25,000’TVD>3 different reservoirs
Find Blog
Jumat, 29 Mei 2009
Thunder Horse Well Challenges
Diposting oleh migasnet01_muhammad718 di 18.17
Label: Minyak dan Gas
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar