Deep Water Shallow Water Flow
– Washed out top hole Section
– Casing Erosion
Solution: Run Liner while Drilling
– Hole Protected
– Liner at Desired Position
Open Requirements:
– Immediate Cementing Option
(Cement through motor or new method to be designed)
– >= 20” DL Tool Sizes
– Liner Hangers (current .max.=16”)
Find Blog
Selasa, 02 Juni 2009
Drilling Liner (Application 4)
Diposting oleh migasnet01_muhammad718 di 21.47
Label: Minyak dan Gas
Langganan:
Posting Komentar (Atom)
0 komentar:
Posting Komentar